EMA5-2026-525125732
Sensitive installations which could be damaged by PIT e.g. electrical cabinets, IDFs or pipework are protected by barriers or bollards. "Selection of barriers shall be in accordance with section 2.7 Guidance on the Physical Protection of People and Infrastructure at Amazon."
Pending
Asset
Type: Safety
Asset ID: EMA5-Walkways PIT Lane and Parking Areas-1
FC: EMA5 /
People
Found by: anmgnz@amazon.es
Last update by: okaforug@amazon.co.uk
Vendor:
Timeline
Identified: 5/25/2026
Last update: 6/1/2026
Completed: —
Verified: —
Description
Sensitive installations which could be damaged by PIT e.g. electrical cabinets, IDFs or pipework are protected by barriers or bollards. "Selection of barriers shall be in accordance with section 2.7 Guidance on the Physical Protection of People and Infrastructure at Amazon."
Comments history
6/2/2026: (okaforug) Team Assigned to has been changed from Amazon Ops Eng to TGW so the status is being reset to Pending 5/25/2026: (anmgnz) TGW electrical cabinets installed on the mezzanine pillars in close proximity to the PIT charging areas. Panels will obstruct PIT drivers when reversing from charging area. Panels need to be moved to the next pillar. Location: GL B51 and GL G51 if this option is not feasible, move to the opposite site of the same beam.